RECOMMENDATIONS OF THE ADMINISTRATION - March 18, 2002
INFORMATION:
In order to complete the design for the replacement of the cooling tower at East Hills Middle School, an electrical service load study of the existing system is required. Albarell Electric's Tegg Service Department has submitted a cost estimate of $910 to do this study.
RECOMMENDATION:
That the Board of School Directors authorize a contract to Albarell Electric to perform a load study of the existing electrical system required for the cooling tower replacement at East Hills Middle School, at a cost not to exceed $910.
The administration's recommendations 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 19, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 31, 33, and 34 were considered together.